Traveler looking at an airport departures board, a metaphor for AI vendor dependency

Publications

Someone Else's Calendar: The AI Vendor Dependency Nobody Negotiates

Hector Pincheira

Hector Pincheira

CIO | CTO
Digital Strategy & Technology Innovation

items

A page nobody in your company has bookmarked

There is a web page that sets dates inside your company, and nobody in your company has it bookmarked. It is not on the intranet. It is your model vendor's deprecation log, where it publishes which versions get switched off and on exactly which day, because publishing there is all the notice you are going to get. On 11 September 2026 a new line appeared. A specialized model was going out of service on 1 October. That is what AI vendor dependency looks like once it finally shows up written on a calendar.

Nineteen days.

Nobody in your organization signed off on that date. Nobody discussed it either. If any flow of yours hung on that version, then the schedule for your next production change was just written by a team that does not know your company's name, that answers to no board of yours and that, with complete contractual legitimacy, did exactly what the contract allowed it to do.

The contract allowed it because somebody on your side signed it.

AI vendor dependency is not measured in dollars

When a committee assesses its exposure, it almost always converts that exposure into money. Switching cost. Migration cost. What walking away would cost us. It is a reasonable question, and it is also the comfortable one, because it has a numerical answer and can be handed to procurement without anyone in the room feeling uncomfortable.

AI vendor dependency is measured in how many decisions inside your company carry an expiry date set by someone who does not sit on your committee.

That is the unit. An expensive contract you can walk away from is a budget problem, and the CFO solves it with a spreadsheet. A cheap contract you cannot walk away from, whose change schedule you do not control, is a governance problem. The second one lands on you. And the board will hand you the bill in the meeting where it suits you least.

The difference between the two cases is not the price. It is who owns the calendar.

Nineteen days

Minimum notice before an AI model is switched off, in weeks, according to OpenAI's deprecation policy

It is worth saying this precisely, because the individual case is harsher than the general policy. OpenAI publicly commits to at least six months of notice before switching off a general availability model, at least three months for specialized variants, and it admits that models in preview can disappear with two weeks. This past 1 October it published the retirement of three more models, scheduled for April 2027. Six months, met to the day. Nobody broke anything.

Six months sounds like plenty. Now set it next to your operating reality. How long does your organization take to revalidate a process that goes through a quality committee, an internal audit and a client who asks for documented evidence? I have seen business-rule revalidations that took eight months, and not one of them involved changing the engine that runs them. I think it was eight. It may have been more.

Six months of notice against eight months of revalidation. AI vendor dependency lives in that subtraction, and nobody does the arithmetic in the renewal meeting. Nobody does it because the renewal meeting is not about that, it is about the volume discount.

The 70% Gartner just put in writing

Three Gartner figures on the abandonment of vendor-built agentic AI and growth of the AI models market

On 29 September 2026, Gartner published a prediction that ought to make a few people uncomfortable. By 2028, 70% of enterprises will abandon the agentic AI solutions built by their vendors' forward deployed engineering teams. The cause it points to is not technical. Enterprises end up trapped between operating costs that escalate and an inability of their own to evolve what was handed to them.

There is a finer figure in the same analysis, and it is the one I would underline in front of a board. Fewer than one in five of those engagements will turn the client's recurring needs into capabilities of the vendor's own product. Translated into operations, eight times out of ten what was built to measure stays made to measure, and someone will have to maintain it forever. That someone sits on your floor.

While that happens, the market for AI platforms and models goes from US$39.311 billion in 2025 to US$64.252 billion in 2026, a 63% jump in twelve months, also according to Gartner. The generative models segment climbs 117%. More vendors, more versions, more dates.

And not one of those dates was set by you.

And here is the point that almost always gets missed. AI vendor dependency does not grow when you sign the big contract, it grows when the vendor starts shipping versions faster than your organization can absorb them.

Where the vendor is completely right

Here I make myself argue the other side, because its case is better than ours. If a vendor froze every version some client happens to use, it would be maintaining forever a fleet of worse models, costlier to run and carrying vulnerabilities it already knows how to fix. Continuous improvement and eternal stability are incompatible. Anyone who asks for both without paying for either is doing wishful math. Seen that way, a good part of AI vendor dependency is something we hand ourselves.

There is more, and it is less comfortable. The vendor's engineering teams tend to deliver in eight weeks what your own area would have taken eight months to stand up. That gap was real. The committee that approved it was right to want the speed, so Gartner's 70% is not only about vendor greed, it is also about an organization that bought speed without buying the capacity to sustain it.

Guaranteed stability does exist, by the way, and it is for sale. Models deployed on your own infrastructure. Versions with extended support. Contractual freeze windows. It costs. Almost no committee that demands stability in the meeting is willing to sign that price once the quote arrives, and that inconsistency is ours, not the vendor's.

It is the same argument we already had about the cloud, with less notice and more urgency. I wrote it up a while back when I compared an architectural decision that defines five years of BI. The vendor changed. The question did not.

Three clauses that correct AI vendor dependency

In that same document Gartner lists what has to be defined before signing. Scope, incentives, governance, ownership and exit. The word exit turns up last, as though it were paperwork (and in almost every contract I have read it is drafted with the enthusiasm of a parking annex). It is the only one that matters once the calendar moves.

  • A freeze window with the price in writing. Do not ask them never to change the model. Ask for the right to stay on a version for a defined term, with the premium on paper. If the vendor will not sell you that, you have just measured your dependency without spending a cent.
  • An inventory of processes by version. Someone has to be able to answer, in an afternoon, which processes depend on which version of which model. If nobody can, the problem stopped being contractual. It is an inventory problem, and that one is worse, because no lawyer fixes it.
  • An owner for the revalidation, with a first and last name. When the vendor announces a shutdown, someone takes on the cost and the timeline of validating all over again. Have that name written down before the announcement. And make sure it is not yours by default.

None of the three is a technical clause. All three are won or lost in a conversation about power, months before any ticket exists. It is close to what I argued in The Empty Chair, though there the missing signature pointed inward and here it points outward.

How AI vendor dependency gets explained to a board

How AI vendor dependency is explained to a board: 45% productivity versus 20% decision quality

Gartner surveyed 204 finance leaders in March 2026. 45% state that their AI investments lean toward productivity, while only 20% lean toward decision quality. The analyst in charge describes the effect with a line worth writing down. A perception gap opens up, where the function reports progress on adoption and the board sees little strategic impact.

That gap is your risk and also your opportunity. If you walk into the board to report how many pilots you have running, you are squarely on the losing side of that survey. If you walk in to say how many critical processes currently carry a shutdown date published by a third party, how many of them have no revalidation plan and who signs each one, then you stopped reporting adoption and started reporting exposure.

The second is a board conversation. The first is a slide.

It bothers me, and I will say it without elegance, that we still measure AI maturity by the number of use cases. It is the easiest metric to inflate and the one that says the least. I already wrote about that in killing AI projects on time, and I still think the same, perhaps with less patience.

A board understands AI vendor dependency perfectly well when you tell it in the board's own language, which is the language of concentrated risk. It does not need to know what a model is. It needs to know who can change its business without asking permission.

What you sign when you sign nothing

There is something I am not going to resolve in this article, and I would rather leave it open than fake an answer. I do not know how you negotiate a freeze window when your model vendor is also your cloud, your email and your productivity suite, and the bargaining power is structurally asymmetric. I have tried. It has gone so-so.

What I do know is the first move, and it costs little. Ask someone on your team to open the deprecation pages of your three main vendors, write down every shutdown date in the next twelve months and cross them against the processes that depend on them. It is an afternoon's work. Maybe two, if the inventory is in the state these usually are.

Then take that table to the committee. Do not explain it. Leave it up on the screen and wait for someone to ask where the dates came from, because the right answer is that they came off the internet, that they have been public for months and that nobody in this room had ever looked at them. Agent risk, as I argued in 198 impossible tasks, almost never starts where we go looking for it.

Reducing AI vendor dependency does not start with a tender. It starts with a table of dates that does not exist today.

And that table will have one column nobody knew how to fill. Who signs. Do not fill it in yourself.

Most Read

QlikSense Hierarchy: parent-child chart of accounts expanded by levels
QlikSense Hierarchy: the Chart of Accounts That Doesn't Add Up
QlikSense Sum TOTAL: share of each family over the total
QlikSense Sum TOTAL: the Percentage That Changes When You Filter
SAP Business One Inventory Revaluation - featured image of the tutorial
SAP Business One Inventory Revaluation: Fix Wrongly Loaded Costs
Empty chamber with wooden benches: the counterweight that required being present to be used
The Veto You Had to Say in Person: Your Decisions With No Counterweight
SAP Business One customizations - featured image of the pre-upgrade audit tutorial
SAP Business One Customizations: Pre-Upgrade Audit
SAP Business One Customer Concentration - featured image of the tutorial
SAP Business One Customer Concentration: Measure Your Risk with SQL

RELATED ARTICLES

Empty chamber with wooden benches: the counterweight that required being present to be used
Leadership in times of AI

The Veto You Had to Say in Person: Your Decisions With No Counterweight

There was once a post whose veto counted only if you said it in the room, in the flesh, at the exact minute. Nobody repealed it: the one deciding ended up keeping it. Your committee has just repeated the manoeuvre without noticing, and that is how decisions with no counterweight are born, the kind no governance framework ever catches.

A harbor pilot advising the captain on a ship's bridge, a metaphor for the CIO's responsibility without authority
Leadership in times of AI

The Pilot on the Bridge: the Responsibility Without Authority the CIO Accepted

On a ship's bridge, the one who knows the channel best advises and the one who answers commands. In your company it runs backwards: the business buys the AI and the CIO signs the inquiry. Three 2026 data points, one uncomfortable concession and three moves to take responsibility without authority apart before the bill arrives.

AI apocalypse - featured image
Leadership in times of AI

The Anti-Comet Pill: Why the AI Apocalypse Suits Your Committee

Two hundred thousand layoffs in three years against one million seven hundred thousand separations in any given month. The labour apocalypse did not arrive, but the conversation that does matter is not happening either. Why the two prophecies about AI, the one about jobs and the one about the rebel machine, are so comfortable for an executive committee.